Skip to page body Home About Breckenridge Government Departments & Services Arts Recreation I Want To...

Second Water Plant

In 2011, a task force was established to consider issues relative to the Town’s water system. It became apparent that the raw water supply to the existing Gary Roberts Water Treatment Plant (GRWTP) would be very low in an extreme drought and this may risk being able to provide enough water once build-out is achieved. In addition to the water supply issue during drought conditions, other concerns such as water quality after a wildfire, redundancy of treatment capacity, operational flexibility and environmental health of the river were discussed.

As a result, the Second Water Plant Feasibility Study was performed to better understand if a second water plant would be beneficial. The study considered things like the future population growth, water quantity, water quality, water rights, potential plant locations, potential distribution improvements and estimated costs.

The study recommends a 3 MGD plant to meet future population demands, provide redundancy to the existing treatment plant, provide alternative water supplies in case of wildfire in our watershed, and provide additional service to the existing homes and lots near the existing water system boundary.

blue river

The feasibility study can be reviewed by chapter at the following connections.

Feasibility Study Title, Contents
Plant Feasibility Study Executive Summary
Plant Feasibility Study 1.0 Potable Water Demand Projection
Plant Feasibility Study 2.0 Plant Size and Treatment Process
Plant Feasibility Study 3.0 Plant Site Analysis
Plant Feasibility Study 4.0 Distribution System Improvements
Plant Feasibility Study 5.0 Estimated Costs, Implementation Schedule and Recommendations
Plant Feasibility Study 6.0 Financing
Plant Feasibility Study 7.0 Wildfire Impacts and Utility Response
Plant Feasibility Study 8.0 Appendices

To provide input, visit http://www.EngageBreckenridge.com 

Last updated: 2/24/2014 6:33:36 PM